Salvage of the Maurienne

On the 7th of February in 1942, the master of the 3,259 GRT freighter Maurienne was dealing with some frozen pipes in one of the holds. He subsequently directed a worker to use an acetylene torch to thaw said pipes, and a fire later erupted in that same location. When conventional efforts to extinguish the fire were unsuccessful, the master ordered the scuttling of his vessel, which in turn resulted in the almost total loss of the cargo after she capsized at the pier (as noted on page 21 of International Maritime Conventions: Volume 1, which also details a legal action brought against the shipping firm by the owners of three crates and one drum of shoe leather). 

Built in Denmark in 1938 as a refrigerated vessel to transport bananas, and only taken over by the Canadian Government at the beginning of the war, Maurienne was a new vessel . Coupled with the fact that the 324-foot vessel was also blocking the use of a portion of Pier 27/28 in the wartime Port of Halifax, her salvage would presumably have been a priority, and therefore she was subsequently salvaged by Foundation Maritime. 

The capsized freighter Maurienne.

Another view of the capsized ship, with the superstructure facing the pier. I'm assuming these photos were taken right after the sinking, such that reserve air in the hull was keeping the hull barely afloat, as later images suggest the hull was farther below the surface during the salvage work, and these photos do not appear to me to have been taken at low tide.
The salvage of the Maurienne was undertaken by Foundation Maritime in two main phases: righting, and then refloating. To begin, at least two cofferdams were constructed on the side of the ship to allow work to continue in the dry - two righting masts had to be attached to the side of the ship.

By June 24, 1942, Cofferdam #2 was ready to accept the righting mast. The two legs of the righting mast will go into the two openings marked with an "X". The "No.1" in the corner of the image refers to the image number, and not that of the cofferdam (which I got from the image caption).

A pontoon supports a diving platform alongside Cofferdam #2 - the platform seems to be slung from the two arms. At least two divers sit in their suits on the platform. 

Cofferdam #1 (background, with mast installed) and Cofferdam #2 (foreground). A support pontoon lies alongside each cofferdam, presumably carrying the pumps to keep each cofferdam dry. Foundation Scarboro, without her shear legs installed, is to the left of the image.

Foundation Scarboro starting to lift the righting mast into place in Cofferdam #2.


The righting mast being installed in Cofferdam #2.

Workers help drop the righting mast into place within Cofferdam #2, as seen from atop the rotating crane cab on Foundation Scarboro.

Cofferdam #1 with the righting mast installed. A bridge (without railings!) extends back to the Pier at the right of the photo. So much for Health and Safety.


Righting masts installed, but with cofferdams removed, to show how the masts are attached to the side of the ship.
By July 26, 1942, the ship was ready to be righted. Tension was taken up on the cables attached to the two righting masts, and the ship was slowly righted. Presumably the hull was anchored to the bottom in some manner to ensure the hull rotated, and was not simply pulled away from the pier. 

Note: Mac Mackay of Shipfax was kind enough to tell me that this type of salvage is properly referred to as "parbuckle salvage", or "parbuckling". The "righting masts" as I call them above are properly called "bents".


Righting the Maurienne.

Just past 45 degrees.

Once righted, there was a release of air trapped in the ship.

Righted, but not yet refloated.


Believe it or not, this appears to have been the easy part of the salvage. Maurienne was still sitting on the bottom of Halifax Harbour, and needed to be refloated. Foundation Maritime elected to build a new, larger, cofferdam around the majority of the ship's deck. The cofferdam extended above the surface of the water at high tide (you can see the stains from the tidal cycles on the side of the cofferdam) so that the interior of the ship could be pumped out. 

Construction of the new cofferdam proceeds around a forward mast, ahead of the bridge which appears to the left of the image.

The view from inside the cofferdam, taken looking forward from aft of the funnel. To the right is a wooden frame that appears to be used to handle a couple of pumps. This may have been positioned over one of the ship's holds. 

The view from the deck of the ship itself, within the cofferdam.


Two of the Jaeger engines used during the salvage - I'm assuming these were diesel engines used to power centrifugal pumps.

The pumping operation is underway, and a deckhouse at the stern has just broken the surface.

Pumps running from inside a cofferdam to bring Maurienne to the surface.


Pumping continues. Taken on the port side this time, the ship's nameboards can be seen displaying "Maurienne". 

The cofferdam support framework on the starboard side next to the funnel, with the pumps running.

Some of the array of pumps that was used to bring Maurienne back to the surface. 


In conjunction with the pumping operation, barges with shear legs also appear to have been lifting at the bow, ahead of the cofferdam. These may have helped to keep the ship on an even keel during the refloating operation.


Pumps running from the cofferdam, with the bow gunwale appearing to the right. The barges with shear legs can also been seen lifting here. 




Returning to the surface, though still with a list to starboard.


With pumps still running, Maurienne arriving at the surface. The deckhouse from Image #120 above can be seen here, just behind the cofferdam.
In November of 1942, while Maurienne was once again afloat, work was ongoing and the ship still looked much the worse for wear.

The refloated Maurienne. What I assume are the remains of the attachments for Righting Mast #1 can be seen just above the waterline just forward of the bridge.
Maurienne from aft.

After the war ended, Maurienne was returned to her original owners and refitted once against for refrigerated cargo. She was sold several times after 1953 (and renamed), and suffered another fire in 1963 in Hong Kong that led to her scrapping.

The entire gallery of photos of the salvage operation can be seen here:

https://smcclearn.smugmug.com/Nautical/Foundation-Maritime-storage/4064-Maurienne/n-xh3bMC/i-4WGpSCS/A

Some of the photos appearing here came with captions explaining the procedure, but most did not, and I have interpreted (e.g. guessed) them to the best of my ability.

Bibliography & Acknowledgements:


Bertke, Donald A; Smith, Gordon; Kindell, Don. (2013). "World War II Sea War - Volume 5". Bertke Publications, Dayton, Ohio, USA. Viewed online.



Photos from the AECON collection.

No comments: