Showing posts with label platform. Show all posts
Showing posts with label platform. Show all posts

Saturday, 23 May 2020

Vole au Vent

Vole au Vent is a jackup heavy lift ship built in 2013, and currently flagged in Luxembourg. It was in Halifax this past week to collect components for an offshore wind farm being installed of the coast of the US. More detailed information is available on Shipfax and Halifax Shipping News. 

Vole au Vent jacked up at Woodside on her four spuds. The ship carrying the windmill components, Bigroll Beaufort, can be seen to the left. 


Support columns and windmill blades are still onboard Bigroll Beaufort in this image.

Bigroll Beaufort to the left and Vole au Vent to the right at Woodside.
When not jacked up on her spuds, Vole au Vent is a self propelled ship, and has multiple thrusters for station keeping.

A close-up showing Vole au Vent's helicopter landing pad, bridge superstructure, and three large box thrusters.
One detail in particular that I found interesting is that her large Liebherr crane appears to be built _around_ the aft starboard spud, suggesting to me it might be a custom design for this ship.


The Liebherr crane is built around one of the spuds used to raise the ship.

Vole au Vent left port a few days ago, with only a portion of the windmill components onboard - suggesting she will be back to pick up the rest.

Sunday, 12 April 2020

Heavy Lifting

Over the last twenty years or so, Halifax has hosted visits by several heavy lift platforms associated with the Sable Offshore Energy Project (SOEP). In fact, the second largest of these platforms in the world, Thialf (Halifax Shipping News has written a piece here) is sitting offshore of Halifax Harbour as I write this. Like Thialf, the modern generation of heavy lift platform, such as the Saipem 7000 (currently the world's third largest) is designed (among other things) to transport and place jackets and topsides for offshore oil and gas exploration and production platforms. I have yet to take any photos of Thialf due to the current COVID-19 quarantine, but I have previously written about the visits of Saipem 7000 (1998) and Heerema's Hermod (2003).

Saipem 7000 approaching the jetty in Woodside, with two SOEP jackets onshore to the left of the image.

Saipem 7000 now alongside and with the two jackets lifted onboard.

Shown here in Halifax in 2003, Hermod has since been scrapped. Heerema replaced her, and presumably her older sister Balder, with the new platforms Sleipnir and Thialf.
The history of floating crane platforms lifting heavy loads in Halifax Harbour goes back much further than the last twenty years, however, with (admittedly much smaller) heavy lifts occurring at least as far back as the Second World War. For use in their marine construction and salvage operations, the Foundation Company of Canada and their marine arm, Foundation Maritime, operated several such platforms bearing names such as Foundation Masson, Foundation Mersey, Foundation Scarboro, and Foundation Shipshaw (among others). The heaviest lifter of this bunch was Foundation Scarboro, with a lifting capacity of 230 tons on her shear legs.

One particular operation in 1945 or so involved lifting a number of small wooden tugboats onto a freighter to take them overseas. 

Foundation Scarboro lifting the tug CT65 onto a freighter, which appears to be the Fort Moose. 
"Under Tow" by Donal M. Baird recounts that twenty-two of these small 50-60 ton tugs of the Tanac-class were built of wood in small east coast boat yards, and many were shipped overseas as deckloads, with Britain and the Mediterranean as some of the destinations - one made it as far as Australia. Some remained in, or were repatriated to, Canada and served as late as the 1990s for companies such as Atlantic Towing.

In place of a name, the Tanacs initially carried the letters CT (for Canadian Tug) and a number. CT61 through CT65 were built on the South Shore of Nova Scotia by Industrial Shipping Co. Ltd. in Mahone Bay (61 through 63) and by Smith & Rhuland in Lunenburg (64 and 65). The Shipbuilding History website indicates that CT65 ended up in Italy under the name Tenax. 

Foundation Scarboro underway in Halifax with CT63 on the hook.

Lifting CT65.

Foundation Scarboro started off life with just the two shear legs fitted, but was later refitted to include a rotating derrick crane for more flexible but lighter lifting.

A close-up of the connection detail between the spreader bar and the tug.

A close-up of the connection detail between the spreader bar and the tug.

A close-up of the connection detail between the spreader bar and the tug.


A steel cable wrapped in padding passes down from the spreader bar and under the hull of the tug.


Presumably CT63 on board a freighter.


CT61 and another Tanac tug on-board their freighter. I'm not sure how many of these tugs a freighter could carry at once, but it was at least two at a time. In the top right of the image, just to the left of the bridge of the tug on the right, is what I assume is one of the old Halifax Harbour ferries.

CT64 onboard a freighter.
These tugs were build for the Ministry of War, who ultimately distributed them as needed. According to the Shipbuilding History website, a total of 265 of these tugs were built in Canada between approximately 1943 and 1946. Interestingly, as one of the hundreds of cargo vessels built in Canada during the war, Fort Moose was also built in Canada, at Montreal in 1943.

As it turns out, Foundation Maritime also operated a Tanac tug for a few years after the war, the Foundation Alice. She was built as CT262 at Smith & Rhuland in 1945, but was sold on from Foundation in 1948.

Foundation Alice.


Thursday, 28 September 2017

Heerema's Hermod going for scrap

In 1999 and 2003, Halifax was visited by two large semi-submersible crane platforms in support of the Sable Offshore project, Saipem 7000 and Heerema's Hermod respectively. The former is the younger of the two (completed in 1987), has the heavier lift cranes (two 7,100 tonne models), and is still in service. Hermod, completed in 1979, has recently been sent for scrap.

Hermod, with her two cranes of 5,000 and 4,000 short ton capacities, was in port around April 12, 2003. She transported and installed the jacket(s) (support legs) for the Alma platform, in 67 metres of water depth. At the time, the daily rate to hire Hermod was reported to be in excess of $150,000 per day.

Hermod with McNab's Island in the background.
Hermod is the younger sister of Balder (completed 1978), which is still in service with Heerema.

Hermod, with two offshore supply vessels alongside.

Hermod surrounded by vessels in Halifax.

Hermod ready to be towed out. That's Fenwick Tower in the background under the two cranes.
To replace Hermod, Heerema is building the world's largest semi-submersible crane platform, the Sleipnir, with two 10,000 tonne cranes for a total capacity of 20,000 tonnes. 

As an aside, these four images were scanned from film negatives, and they aren't cleaned up as well as they could be. In addition, there was a spot of dust in the scanner that caused an overexposed line to appear in the center of each photo - best visible in the first image.

Tuesday, 5 September 2017

HMCS WINDSOR returns to the water

On my commute this morning on the ferry, I noticed that HMCS WINDSOR has been rolled out of the submarine maintenance facility building after a refit, and was sitting on the Syncrolift platform. 

WINDSOR sitting on the Syncrolift platform.

WINDSOR sitting on the Syncrolift platform.

WINDSOR sitting on the Syncrolift platform.

On my afternoon commute, the Syncrolift platform and WINDSOR had been lowered into the water.

WINDSOR lowered into the water.

Friday, 31 March 2017

HMCS CHARLOTTETOWN on the Syncrolift

Earlier this month, HMCS CHARLOTTETOWN went on the Syncrolift at HMC Dockyard for some cleaning and maintenance. CHARLOTTETOWN returned from an extended deployment earlier this year, so she was probably in need of some TLC. Her hull below the waterline definitely needed a cleaning.

March 14 - newly on the lift, and looking kind of dirty. © Sandy McClearn.
I managed to take these two photos from almost exactly the same angle, and cropped them down almost identically. It is somewhat entertaining if you go to the Smugmug site where they are hosted, and use the arrow keys on your keyboard to go back and forth between the two images to see the difference (if you click on the image above or below, it will take you there). 

March 24 - the bright blue anti-fouling paint is nice and clean. © Sandy McClearn.
The Syncrolift platform has seen many changes over the years. The original Syncrolift concept was developed by a firm in Florida, and the company was eventually purchased by Rolls Royce. The original Halifax Syncrolift was powered by a total of 34 180-ton winches, with 17 on each side (these are the blue boxes on either side of the lift platform). It was originally constructed in 1967 to allow annual maintenance of the then-new Oberon-class submarines (ONONDAGA, OKANAGAN, and OJIBWA). The platform is nested between two narrow jetties on piles, upon which the winches are installed. The platform can be lowered down into the water to float ships on, and then raised again to lift them out of the water.

In 1970, the original submarine maintenance shed was constructed on the shore side of the platform, and the O-boats could be rolled in and out of the shed to allow maintenance inside a heated shelter. The rails upon which the doors slid open and closed weren't actually long enough to allow the submarine to enter or depart, and the doors had to be removed altogether as shown in the image below to allow the submarine in.

HMCS/M OKANAGAN backing out of the Syncrolift shed in 1985 at the mid-point of her SOUP (Submarine Operational UPgrade) refit. The O-boat's hull design was heavily influenced by Second World War German U-boats, and this is reflected in the continued use of twin propellers and the tail arrangement. At the stern can be seen the indentations from the stern torpedo tubes, which were originally fitted to fire short unguided torpedoes, but by the time the photo was taken were re-purposed to accommodate a towed array sonar (and reportedly cold beer storage).  DND photo, courtesy Corvus Publishing Group.
The Syncrolift worked a treat for the RCN's submarines, but it didn't provide the Navy with the ability to perform basic maintenance on their larger vessels. After the near-bankruptcy of Halifax Dartmouth Industries Limited (HDIL) in the 1970s, the RCN got nervous, and looked for a way to achieve some redundancy for HDIL's facilities. A local engineering firm, CBCL, suggested lengthening the platform from 307 metres to 413 metres and upgrading the winch capacity to allow larger vessels to be lifted out of the water. The Syncrolift was actually used during the construction work, as it was used to lower the new caissons into the water (the new caissons may even have been formed and poured on the platform prior to being floated out). The complement of winches were now made up of 26 180-ton winches, and 20 280-ton winches under the heavier middle portion of the ships (e.g. the engine room). The winches were split with 13 180-ton and 10 280-ton winches on each side of the platform. I have seen somewhere this rendered the Syncrolift capable of hoisting a 6,000 tonne "NATO" frigate, but can't find the reference at the moment. It can certainly handle the 5,235 ton Canadian Patrol Frigate and 5,100 ton IROQUOIS class destroyer (those are their full load numbers, and I'm not sure how heavy the ships normally are when they are hauled out).

HMCS IROQUOIS was the first destroyer lifted by the newly refurbished Syncrolift, on Nov. 1, 1986. The larger winches (the blue "boxes") are of 280 ton capacity each, while the smaller winches are of 180 ton capacity. The 280 ton winches are placed around the machinery spaces of the ship, which weigh more than other portions of the ship. Also seen here are CORMORANT, a Saint class tug, SKEENA, and ATHABASKAN. DND photo, Courtesy of Corvus Publishing Group. 
This meant that one can occasionally get a glimpse of things like the housing for the SQS 510 sonar found under the hull of these ships.

A view of HMCS VILLE DE QUEBEC in the early 2000s from close up. The SQS 510 housing can be seen under the ship, not far back from the ship's forefoot (the bottom of the bow). Canadian Patrol Frigates have bilge keels mounted midships to reduce rolling at sea, also visible here. In the background, the old maintenance shed is still standing. The bright blue anti-fouling paint colour is a relatively new feature. © Sandy McClearn.

HMCS ATHABASKAN. The SQS-510 Hull Outfit C3 sonar dome is removed for maintenance. The fairing itself is seen at bottom left, and is facing backwards. The covers are removed from the winches in this photo.

SACKVILLE was a Syncrolift customer both before and after her restoration to her original appearance as a corvette. Seen here in 2008, she is showing a considerable amount of marine growth. © Sandy McClearn.

A slightly different angle on SACKVILLE. © Sandy McClearn.

The blocking under SACKVILLE is better visible in this image from directly aft. In this photo the old submarine maintenance shed has been torn down, and in its place is a temporary tent structure shielding one of the new VICTORIA class submarines from view and the weather during a refit. © Sandy McClearn.
Although the upgraded Syncrolift could handle the newer and heavier VICTORIA class submarines, there was still a problem. Not only are the VICTORIA class heavier than the older OBERON class submarines, but that heavier load is spread out over a shorter length, and that greater load density meant that the inshore winches and platform support beams were not rated to support the new submarines when they were being transferred inshore for extended refit periods. In the photo above, the submarine in the temporary shelter had to be stripped down to reduce the weight and avoid overloading the inshore 180-ton winches and support beams. The old submarine maintenance shed was also too small for the new submarines, which were beamier than their predecessors.

VICTORIA on the Syncrolift in 2002. Submarine propellers are carefully guarded secrets, and although it would have been tarped at the time I took the photo, I decided to play it safe and not capture it at all. Either that, or my lens simply wasn't wide enough. The old shed seems to be standing in this photo. © Sandy McClearn.
CORNER BROOK in 2008. You can see the difference in size between the 180-ton (left) and 280-ton (right) winches.
© Sandy McClearn.
During the mid-2000s, the old submarine maintenance shed was torn down, and at least one submarine underwent an extended maintenance and refit period under a temporary tent structure on the site of the old shed. After the submarine finished her refit, and was returned to the Syncrolift, construction began on a new submarine maintenance building that could accommodate the newer VICTORIA class. The Syncrolift platform and winches were again upgraded to allow the heavier submarines to be transferred into the new building without stripping them of excess weight. The same bollard and tow motor that were used to haul submarines into the old shed are still used in the new building.

WINDSOR in 2012. To the left of the photo is the control cabin, from where the winches of the Syncrolift are controlled and monitored during operation. © Sandy McClearn.

HMCS ST. JOHN'S has also recently been a Syncrolift customer - she is shown here in September, 2016. This photo catches a lift in progress, with the ropes that held the ship in position over the blocking now falling slack towards the jetty on either side.I'm guessing these ropes would have been taut until the ship started to bear weight on the blocking. © Sandy McClearn.

Clean once again, HMCS ST. JOHN'S is pictured being lowered once again into Halifax Harbour. The new maintenance shed isn't big enough to take a frigate, but could accommodate a smaller vessel like SACKVILLE. © Sandy McClearn.
The utility of the Syncrolift is especially important in recent years, as both floating drydocks at the Halifax Shipyard (the older Scotiadock and the newer Novadock) have both been allowed to decay and have been removed from service and/or scrapped. The only remaining drydock at Halifax Shipyard, the original graving dock that survived the Halifax Explosion, has been almost continuously filled with HALIFAX class frigates during their recent FELEX refits (in fact, the current resident (HMCS HALIFAX) is in her first refit post-FELEX).

In order to write this post, I relied partly on articles in old issues of "Canada's Navy Annual" published by Corvus Publishing Group Ltd. In all, they published 6 issues, plus the original special commemorative issue for the Navy's 75th anniversary in 1985. They have since gone out of business, but were still active in the mid-1990s when I wrote them (while in university) to ask them for permission to reproduce the photos contained therein (which they kindly gave me). I managed to purchase all 7 issues used, probably at J.W. Doull.  


Wednesday, 18 January 2017

Atlantic Griffin begins sea trials (Updated)

Atlantic Towing's new offshore support vessel (OSV) Atlantic Griffin began sea trials yesterday, heading out during mid-day sometime, and returning after dark. She headed out again this morning,  just as fleet-sister Atlantic Condor was returning to port, and I managed to get a few shots of her as the sun came up.

Atlantic Griffin departing this morning just as Atlantic Condor was returning to port. This is a good contrast between the newer design of Griffin to the not-so-much older Condor.
Designed by Damen and built at their yard in Galatz, Romania, she is designated as a Platform Supply Vessel (PSV) 5000. The upper portion of the forward superstructure was separated from the rest of the hull, and the two parts were shipped to Halifax and assembly was completed at Halifax Shipyards. Sistership Atlantic Shrike is also completing in Halifax, and will presumably begin her own sea trials soon.

The lines of this new Damen design are fairly revolutionary, at least in these parts. Her hull certainly seemed to be cutting through the water with little fuss, though to be fair she wasn't going very fast.

Atlantic Griffin in front of Purdy's Wharf.

Atlantic Griffin approaches the lighthouse on George's Island.

There was a nice sky this morning, although the orange and reds in the sky made it difficult to selectively highlight the orange of Atlantic Griffin's hull.

Chebucto Pilot following Atlantic Griffin out this morning.

Atlantic Griffin returning last night.
I include this photo of Atlantic Griffin not because it is very good, but because I was surprised I was able to take it at all. I took this from the ferry, a moving platform, just before 7pm and it was dark enough that all my eyes could make out were the lights on the ship. I set my camera's ISO to 25,000, opened up the aperture to f4, and did my best to hold the camera steady - and was rewarded with an image of the entire tug, orange hull and all, and not just the lights. Camera technology has come a long way in the last 10 years.

Update:

According to Tugfax, Atlantic Griffin was performing a bollard test on January 20, see seen in the following photos.

Atlantic Griffin bollard pull test at Pier 26.
Atlantic Griffin bollard pull test at Pier 26.
Atlantic Griffin bollard pull test at Pier 26.

Atlantic Condor:

Atlantic Condor herself has also been in and out a fair bit lately.

Atlantic Condor taken just last week on January 13th, again with the George's Island lighthouse to the left.
Atlantic Condor passes in front of the Navy's Tribute Tower, the new Junior Ranks Mess and Accommodation.
Unlike her two newer fleet sisters, Atlantic Condor was build right here in Halifax, and was launched back in October of 2010. Here are some images from her launching.

The day prior to the launch, October 30, 2010, some of the smaller tugs such as Atlantic Larch put on a bit of a show.



This image of Atlantic Oak is one of my favourites.
The remainder of the images here were taken October 31, 2010, the actual day of the launch. Atlantic Condor was one of the last vessels launched from the old launch ways from which other fleet mates, the Coast Guard inshore patrol vessels, the MCDVs, and many other ships were launched over the years. 

Atlantic Condor has just started to slide down the ways, her bows meeting the water for the first time.

Here she really has her feet wet, with only her running gear and rudders still out of the water.




Once fully afloat, she was herded into place by her smaller fleet sisters. 





Atlantic Condor has been quite busy ever since, and one presumes that the newer Atlantic Griffin and Atlantic Shrike will be kept similarly busy.